Mobile Timer for Toggl Track starts and stops your Toggl timer from an Obsidian note

Control your Toggl Track timer and see the daily total from a note.

MIT · no telemetry · core features free

Pro adds "Project and tag pickers" and "Reports by project or day". Pro for all 134 plugins, $15 one time

Read documentation (21 languages)

The timer panel beside the note Writing log, with a running timer at 0:27:15, a day total of 3h 07m and three finished entries.
Open larger
version
1.2.3
released
downloads
168
review
Passed
health
Excellent
license
MIT
listed for
Desktop, Mobile
obsidian
1.13.4 or later

The directory lists the plugin for desktop and mobile, and its tests run in the desktop app only, with a stand-in for Toggl. No test in the repository ran on a phone or tablet, and none calls the real Toggl service.

Directory facts fetched from community.obsidian.md/users/theluckystrike.

checked
Version 1.0.0 on 10 October 2026, in Obsidian 1.14.4 on desktop. The current version is 1.2.3, and it has no check yet.
passed
Install, Pro text, sign in, Pro stays off, token storage.
in part
Free feature, network. The check ran without a Toggl token.
checked by
An automated check that the developer runs, not a review by Obsidian. See what each check means

About Mobile Timer for Toggl Track

You track time in Toggl Track and want to start and stop the timer from the note you write in, without opening another app.

Mobile Timer for Toggl Track starts, stops and switches your Toggl Track timer from a note, and shows the running timer and today's total. It uses the request function that Obsidian gives to plugins and no Node module. The directory lists it for desktop and mobile, and it is tested on desktop only.

The plugin contacts Toggl Track with your API token. Toggl and Toggl Track are trademarks of their owner, and Toggl does not make or endorse this plugin. Timers, the panel, daily totals, note logs and one default project are free. Pro adds pickers, reports, edits and an offline queue.

A desktop window where the timer panel shows no timer running. The Start timer window opens with the description Writing log. A timer then runs at 0:27:15, and after the stop the panel lists four finished entries.Play demo

Free features

Start, stop and switch a timer

Run Start timer, and a window asks for a description and offers the name of the open note. Stop timer stops it, and Switch timer stops the running timer and starts a new one. Start timer for this note starts at once with no window, with the one default project from the settings.

The Start timer window with the description Writing log, and a Project row that says No default project.
Open larger

Choose whether the note title goes to Toggl

The setting Use the note title as the description is on by default. With it on, the title of the open note becomes the description of a new time entry, and Toggl receives it. With it off, no note title is sent unless you type one.

The timer panel and the ribbon button

The command Open timer panel shows the running timer, its clock, today's total, the buttons and up to 25 finished entries of today. The ribbon button starts or stops the timer and turns red while a timer runs. The clock counts from the start time that Toggl holds, so it needs no request each second.

The status bar on desktop

On desktop the status bar shows the clock, the project and description, and today's total. Select it to open the panel, or turn it off in the settings. The plugin adds no status bar item on mobile, where Obsidian does not support one.

The status bar below the note Writing log shows 0:27:17, the entry Draft the release notes and the day total 3h 07m.
Open larger

Made for 30 requests an hour

The Toggl free plan allows 30 requests an hour, and the plugin counts each one. A background refresh costs one request, Start and Stop cost one each after the first start, and Switch costs two. Background refreshes stop when 8 requests are left, and after HTTP 402 or 429 the plugin waits and shows how long.

The timer panel with the line Toggl limit reached, retry in 31 min, and 0 of 30 requests left this hour.
Open larger

Log finished entries in a note

Open a daily note in edit mode and run Log today to this note to add cached finished entries beneath a configurable heading. The command sends no request and skips running or unsent entries; midnight-crossing entries contribute only today's part. Hidden markers prevent duplicate copies, and later Toggl edits don't update inserted lines.

Finished timer entries appear under Time tracking in a daily note.
Open larger

The free version has no time limit, and each timer gets the one default project that you choose in the settings.

Pro features

Pro costs $5 a month or $15 one time through GitHub Sponsors.

One payment of $15 turns on Pro in 134 NoteMods plugins.

Project and tag pickers Pro

With Pro the Start window has a project list and a tags field, with up to 10 tags for a timer. A note can set its own project with a property named toggl-project, which holds the name of an active project. The property works after the plugin has loaded your project list, for example with Load projects in the settings.

The Start timer window over the note Project plan, with the project list set to Code and an empty tags field.
Open larger

Reports by project or day Pro

A toggl-report code block draws a table of hours by project, day or description. The range line takes today, yesterday, last7, week, month, or two dates up to 366 days apart. One request fills the table for a range, and the plugin keeps the answer for 15 minutes.

The note Weekly report with two tables, hours by project for Docs and Code and hours by day, each with a total of 3.12.
Open larger

Edit and delete past entries Pro

Each finished entry of today in the panel gets an edit button. The window changes the description, the project, and the start and stop time, and it keeps the tags. Delete removes the entry from Toggl after a second selection.

The Edit time entry window for Review notes, with the project Docs, start 11:00 AM, stop 11:40 AM, and the Save and Delete buttons.
Open larger

Offline queue Pro

With no connection, or while Toggl limits requests, a start or stop waits in a queue of up to 40 changes. The panel shows the change at once, and a start followed by a stop later goes out as one finished entry. Without Pro, such an action changes nothing, and a notice says so.

The timer panel with the timer Call with the team, the line No connection to Toggl, and 1 change waits to be sent.
Open larger

$15 once. Pro tools in 134 NoteMods plugins with one GitHub sponsorship. Nothing renews.

Pro turns on right after payment. Select Sign in with GitHub in the settings of each plugin you use. Free features stay free.

Secure checkout by GitHub Sponsors - needs a GitHub login.

We email you this link once, and one reminder if you confirm. Unsubscribe any time.

Price tiers

17 of 50 founding licenses sold.

  1. Founding price · now$15licenses 1 to 50
  2. Tier 2$19licenses 51 to 150
  3. Tier 3$24licenses 151 to 300
  4. Tier 4$29licenses 301 and more

The price is set on the 1st of each month. It goes up only after a tier is full. Until then it stays $15. The next price review is on 1 December 2026.

A price change does not change a license that you paid for. The $5 a month option stays.

Get Pro with GitHub Sponsors

One sponsorship turns on the Pro features in 134 NoteMods plugins. Free features stay free.

$15 one time: Pro stays on, nothing renews. $5 a month: Pro is on while you sponsor, and stays on after you have paid $15 in total. You pay on GitHub (a GitHub login is needed), then select Sign in with GitHub in the plugin settings. All sponsor tiers

Set up Mobile Timer for Toggl Track

needs

  • Obsidian 1.13.4 or later
  • A Toggl Track account and your own API token. The plugin is built for the 30 requests an hour of the free Toggl plan.
  • A connection to Toggl for each action, unless you have Pro and its offline queue.
  • The plugin uses your default Toggl workspace only.

steps

  1. Install Mobile Timer for Toggl Track from Community plugins and enable it.

  2. Copy your API token from your Toggl Track profile settings.

  3. In the plugin settings, select the token field, create a secret and paste the token.

  4. Select Check connection. Select Load projects if you want a default project.

  5. Open a note and run Start timer.

If the app can't find a new plugin yet, try again later. Obsidian says a plugin that passes the review shows in the app within 24 hours.

Why this exists

The free Toggl Track plugin is desktop only, and its request for mobile support has been open since February 2022. The request has 4 reactions and 12 comments, and in January 2023 the maintainer wrote that mobile support was not planned soon.

How to use a Toggl Track timer in Obsidian on mobile

How it compares

Toggl Track (obsidian-toggl-integration)
The older plugin obsidian-toggl-integration is desktop only, because it bundles a Node HTTP client. This plugin is a separate build and uses no code from it.

Known limits of Mobile Timer for Toggl Track

  • A toggl-report block counts at most 1,000 time entries for its range and shows no notice when the range holds more.
  • The Pro offline queue holds a start and a stop only, so an edit or a delete of an entry fails without a connection.
  • Pro can edit or delete only the finished entries of today, at most 25 in the panel, and the edit window can't change the date.
  • The plugin uses your default Toggl workspace and has no setting to choose another one.

Need a change for your team? I build custom Obsidian plugins and features.

Questions about Mobile Timer for Toggl Track

Does Mobile Timer for Toggl Track work on iPhone, iPad or Android?

The directory lists it for desktop and mobile, and it is tested on desktop only. The code uses the request function of Obsidian and no Node module. No test in the repository ran on a phone or tablet, so treat mobile as untested.

What does the plugin send to Toggl, and when?

It sends your API token with each request to api.track.toggl.com, and a time entry when you start, stop, edit or delete a timer. An entry holds the description, project, tags, times and workspace number. The description is the title of the open note, unless you turn off Use the note title as the description in the settings. Requests go out when Obsidian loads, when it returns to the front, and when you act, with no note text and no telemetry.

Where is my Toggl API token stored?

The token stays in the secret storage of Obsidian on the device, and not in a note or in data.json. Obsidian lets any plugin in the vault reference a secret by its name. The token does not sync, so paste it on each device. The file data.json does hold a cache of your recent time entries, projects and tags.

What happens when I reach the Toggl request limit?

Toggl answers HTTP 402 when the hourly quota is used up, and the plugin then waits until the window that Toggl reports is over. After HTTP 429 it waits 2 minutes, then longer, up to 20 minutes. The panel shows the wait, and the settings show the requests that are left.

How do I get Pro, and how often does the plugin check it?

Sponsor on GitHub Sponsors for $5 a month or $15 one time, then select Sign in with GitHub in the settings. A total payment of $15 meets the payment rule, and one sponsorship turns on Pro in each of these plugins with Pro. Sign in and the check still apply. After a successful check the plugin waits 7 days, and after a failed check it tries again every 6 hours.

Network use

With a saved Toggl API token, the plugin sends it to api.track.toggl.com when Obsidian loads or returns to the front and when you act. A change carries the time entry, whose description is the note title unless you turn off Use the note title as the description. After you select Sign in with GitHub, it also asks github.com and api.github.com about your sponsorship, 7 days after each successful check.

Read the full network disclosure

Questions or ideas?

Tell me what is broken in Mobile Timer for Toggl Track, or what it should do next.

Send feedback

Mobile Timer for Toggl Track 1.2.3, MIT license

MIT · no telemetry · core features free

Read full documentation (21 languages)

Pro adds "Project and tag pickers"Pro for all 134 plugins, $15 one time

Get Pro